Work on junction 5 of the M2, where the A249 from Sittingbourne and Sheppey meets the motorway at Stockbury, began in June 2021. By early 2025 the contractor GRAHAM had finished a flyover nearly a mile long and two new slip roads that take A249 traffic directly onto the M2, bypassing the Stockbury roundabout. About £100 million was invested in the junction. For Sittingbourne's industrial estates, which reach the M2 by the A249, it rebuilt the main route to the motorway.
What changed at Stockbury
Alongside the flyover, built from 1,500 reinforced earth panels on two bridges whose concrete beams weighed up to 56 tonnes each, the scheme added a gyratory without traffic lights and a link road between Maidstone Road and Oad Street. Before the flyover, A249 traffic for the M2 went round the Stockbury roundabout. Panattoni puts its park at Kemsley about 4 miles from junction 5 and 11 miles from junction 7 of the M20, and 1 mile from the A249 itself.
Swale Way and the unfinished relief road
Inside the town, Eurolink is reached from the A249 at the Grovehurst junction, then along Swale Way and Castle Road. In 2015 the Northern Relief Road ran from the Grovehurst roundabout as far as Great Easthall, and the missing link to the A2 near Bapchild was estimated to cost about £25 million. Agents' particulars for Eurolink in 2026 still describe direct A249 access via the Northern Relief Road and Kemsley. Check how a unit on the eastern side of the town reaches the A249 before you commit to it.
Distances that matter to a haulier
From Heard Way on Eurolink, agents quote about 6 miles to junction 5 of the M2 and 12 miles to junction 7 of the M20. From Panattoni Park, Panattoni quotes 53 miles to London, 30 miles to junction 2 of the M25, 35 miles to Dover and 41 miles to the Channel Tunnel. For journeys into Essex, the Lower Thames Crossing began early works in March 2026, with major construction due from 2028 and opening expected in the early to mid 2030s. It is intended to ease congestion at the Dartford Crossing.
Who the road network suits
Hauliers, distributors and contractors running between Kent's ports, the Medway towns and London will find units close to the A249 quicker onto the motorway since the Stockbury flyover opened. Businesses that depend on a fast route east towards Canterbury should test their journeys at peak times first, including the run from their unit to the Grovehurst junction. The listings below show what is available now.
FAQ
Is the M2 junction 5 improvement finished?
Yes. GRAHAM completed the scheme in early 2025, including the Stockbury flyover and new slip roads between the A249 and the M2.
How far is Sittingbourne's Eurolink estate from the M2?
About 6 miles to junction 5, using Swale Way and the A249, and about 12 miles to junction 7 of the M20, according to agents.
What is the Sittingbourne Northern Relief Road?
A road from the Grovehurst roundabout, which in 2015 ran as far as Great Easthall. Agents describe it as giving the Eurolink estate direct access to the A249.
When will the Lower Thames Crossing open?
National Highways expects it to open in the early to mid 2030s. Early works began in March 2026 and major construction is due to start in 2028.