Panattoni's brochure for its park at Kemsley lists each building's power next to its floor area. The 205,788 sq ft unit has 2.07 MVA from the grid and 0.45 MVA from solar panels on its roof, which Panattoni estimates will save £87,600 a year. The 440,167 sq ft unit has 4.43 MVA and 0.90 MVA. Across the site, 6.5 MVA is available from the grid, exactly the two buildings' grid supplies added together.
What the Prime Minister said about connections
On 1 September 2026 the Prime Minister, Andy Burnham, told the Commons that it was "taking far too long for businesses to get grid connections" and that they were being quoted "prohibitively expensive sums". On 29 September he announced Great British Grid, a publicly owned company within Great British Energy, meant to speed up connections for businesses. He also called for "a more intentional approach to the reindustrialisation of Britain". Great British Grid has no timetable, so a business needing a bigger supply next year should plan on the present process.
Where Kemsley's heavy infrastructure sits
The paper mill at Kemsley makes much of its own energy. An energy-from-waste plant beside it began operating in 2020 and supplies about a third of the mill's steam, and a combined heat and power plant built with E.ON opened in 2022. In November 2021 Pivot Power, part of EDF, switched on a 50 MW battery at the Kemsley substation, connected to National Grid's transmission network. None of this guarantees spare capacity for a new occupier, but it suggests that Kemsley is where the large connections are.
Questions to ask on an older estate
Before you sign for an older unit on Eurolink, ask the agent for the supply capacity in kVA, whether it is three-phase, and whether any upgrade has been applied for. If you plan to charge vans on site, have an electrician estimate what the existing supply will carry. Panattoni's base specification at Kemsley includes 20 EV charging points and sub-metering of energy, which gives a useful benchmark when comparing older buildings. Ask, too, whether the landlord would allow solar panels on the roof. If an upgrade is needed, factor its cost into any offer.
Whose plans depend on supply
Manufacturers, cold stores and operators planning automation or electric fleets should treat power as a deciding factor and allow time for an upgrade. Storage firms, trades and workshops with ordinary lighting and machinery loads will rarely need more than an existing unit provides. For them, eaves, rent and van parking at the Smeed Dean Centre or Heard Way matter more. The listings below show what is available now.
FAQ
How much power do the Panattoni Park Sittingbourne warehouses have?
The 205,788 sq ft unit has 2.07 MVA from the grid plus 0.45 MVA of rooftop solar. The 440,167 sq ft unit has 4.43 MVA plus 0.90 MVA of solar.
Is there a battery storage site at Kemsley?
Yes. Pivot Power, part of EDF, switched on a 50 MW battery at the Kemsley substation in November 2021, connected to National Grid's transmission network.
What is Great British Grid?
A publicly owned company within Great British Energy, announced on 29 September 2026 to speed up grid connections for businesses. No timetable has been given.
How much can rooftop solar save a Sittingbourne warehouse?
Panattoni estimates £87,600 a year for the 0.45 MVA array on its 205,788 sq ft unit at Kemsley.