When Unit B at Railway Triangle was completed in November 2025, its particulars gave the electricity supply, 2.1 MVA, alongside the floor area of 106,605 sq ft. The building is fully electric and is targeting an EPC rating of A+. For the newest warehouses around Portsmouth, power and energy ratings are now listed as prominently as height and loading doors, and a tenant comparing them with older units should ask the same questions of both.
What the new buildings put on paper
Railway Triangle Unit B has 7 kW chargers in its car park, solar panels and LED lighting. At Sonar in Hilsea, all seven units carry BREEAM Excellent and EPC A or A+ ratings, with solar panels and electric vehicle charging. At Dunsbury Park, the council markets its remaining plots with a high power supply and solar panels. The older estates say less. At the Skill Centre on Limberline Spur, the particulars for Units 3 and 8G mention three-phase power, with no capacity given, and the energy rating is available on request.
Slow connections and a public grid company
On 1 September 2026 the Prime Minister, Andy Burnham, told the Commons that it was ""taking far too long for businesses to get grid connections"" and that they were being quoted "prohibitively expensive sums". On 29 September he announced Great British Grid, a publicly owned body within Great British Energy to speed up connections for businesses, with no timetable. Portsmouth International Port knows the problem. Its shore power system, which two Brittany Ferries ships and a cruise ship now use, took a five-year effort that included securing extra power from the grid.
Energy ratings and a longer lease
In June 2026 the government confirmed that the minimum energy rating for letting commercial property stays at E, dropping a proposed move to C by 2027. Buildings over 1,000 sq m, about 10,764 sq ft, will need to reach B by 2031 where that is cost-effective. Smaller ones stay at E, and the regulations are still to be made. Every Skill Centre unit listed on 4wallsspaces in October 2026 is below that size. For a larger unit on a long lease, ask for the current rating and who would pay for work to reach B.
Whose search should start with the power supply
Manufacturers, cold stores, firms charging electric vans and anyone planning automation should ask for a unit's supply capacity before viewing, and allow time for an upgrade. Storage businesses, trade counters and small workshops with ordinary lighting and machinery will usually find three-phase power enough. The listings below show what is available now.
FAQ
How much power does Railway Triangle Unit B in Portsmouth have?
2.1 MVA, for a 106,605 sq ft fully electric building at Railway Triangle completed in November 2025.
Do the Skill Centre units in Hilsea have three-phase power?
The particulars for Units 3, 8G, and 8E and 8G together list three-phase power. Ask the landlord for the supply capacity of any unit you are considering.
What is Great British Grid?
A publicly owned body within Great British Energy, announced on 29 September 2026 to speed up grid connections for businesses. No timetable has been given.
What energy rating do new Portsmouth warehouses have?
All seven units at Sonar in Hilsea have BREEAM Excellent and EPC A or A+ ratings, and Railway Triangle Unit B is targeting A+.