Portsmouth's planners describe the city as "largely an island economy", and the island has very little land left on which to build. The Local Plan that will guide development to 2040 was submitted for examination on 18 March 2026. Its evidence forecasts a need for 81,605 sq m of new floorspace for manufacturing, warehousing and research between 2025 and 2040, about 878,000 sq ft, and the council itself expects to fall a little short.
The numbers behind the Local Plan to 2040
The council's economy topic paper for the examination, published in March 2026, sets out the sums. At 31 March 2025, planning permissions covered 33,130 sq m of industrial and warehouse space and 7,868 sq m of research and light industrial space. Lakeside North Harbour is expected to provide 50,000 sq m of employment space late in the plan period, and Tipner West 25,000 sq m. The paper concludes there is ""a small under-supply"" of industrial floorspace. Offices are the opposite case, with a surplus of 31,261 sq m, part of which Havant Borough Council has asked to count towards its own shortfall.
Tipner West shrinks and the marine plans go
One large source of employment land has already shrunk. Tipner West was to provide 58,000 sq m of employment space. The November 2025 addendum to the plan cut that to 25,000 sq m and accepted that the marine employment centre planned there cannot be provided.
Existing space has been changing too. In 2023/24 the city recorded a net loss of 10,584 sq m of employment floorspace, driven by the loss of 11,186 sq m of older buildings south of Limberline Road in Hilsea, cleared for seven new units.
Hearings this autumn and a second plan already started
The inspectors, appointed on 23 March 2026, held hearing sessions on 21 October, and land west of Portsdown Technology Park is among the matters due on 19 November. The council expects to adopt the plan in early 2027. It has already begun the next one. Scoping consultation on the Future Portsmouth Plan opened on 29 September 2026, with adoption targeted for April 2029.
What scarce land means for tenants
Established estates such as those along Limberline Spur are hard to replace on an island with very little land left to build on. A business expecting to grow should settle lease length and break clauses now rather than wait for a new estate. Firms needing several acres or a large new building will find more choice on the mainland at Dunsbury Park and along the M27. The listings below show what is available on the island now.
FAQ
How much industrial land does Portsmouth need to 2040?
The council's evidence puts the need at 81,605 sq m of manufacturing, warehousing and research floorspace between 2025 and 2040, about 878,000 sq ft. It expects a small under-supply.
When will the Portsmouth Local Plan be adopted?
It was submitted for examination on 18 March 2026, with hearings in October and November 2026. The council expects to adopt it in early 2027.
What happened to the employment land at Tipner West?
The November 2025 addendum to the Local Plan cut it from the 58,000 sq m previously planned to 25,000 sq m.
What is the Future Portsmouth Plan?
The city's next Local Plan. Its scoping consultation opened on 29 September 2026, and adoption is targeted for April 2029.