On 1 September 2026 the prime minister, Andy Burnham, told the Commons that "it is taking far too long for businesses to get grid connections. And they are being quoted prohibitively expensive sums." At Vantage Point Business Village in Mitcheldean, several old factory buildings already have large supplies in place. Building 4 alone has 2,800 kVA, and in 2024 most of the estate's electricity came from solar panels on its own roofs.
Supplies sized for a factory and already connected
Building 4, 82,432 sq ft, has a 2,800 kVA supply, three-phase power, gas and LED lighting. The Sycamore Building, 205,343 sq ft over two floors, has 750 kVA on each floor. Building 66, 33,000 sq ft, has three-phase power, gas and two roller shutter loading doors. Kurt Wyman's 2025 particulars for Building 4 list a large supply taken from the National Grid. The estate was a copier factory employing 4,800 people in the late 1970s, and the connections are already in place. For a manufacturer running furnaces, compressors or CNC machines, 2,800 kVA can matter more than Building 4's 4.2m working height.
Rooftop solar supplying most of the estate
When Sirius Real Estate bought the park in 2024 it also bought a solar business from Brian Bennett, whose panels on some of the buildings then supplied most of the site's electricity. Sirius's chief executive, Andrew Coombs, described it in November 2024 as a model for adding solar across the group's other properties. LSH's particulars for Building 5 list rooftop solar panels among its features.
Ask how your electricity will be supplied and billed. At Vantage Point the price per unit and the contract terms may depend on Sirius's solar arrangements as well as the grid.
Grid connections and the Great British Grid
At Labour's conference on 29 September, Burnham announced the Great British Grid, a publicly owned body within Great British Energy to speed up connections for businesses, working alongside the existing network companies. No timetable was given. One nearby manufacturer is already changing how it uses power: Suntory's factory at Coleford is spending £6.1 million on a 33kV electrification project to reduce its reliance on a gas turbine. Locally, 37,000 panels on 50 acres at Locquiers Farm, Plump Hill, were approved in December 2021.
Who the power supply suits
Manufacturers moving off gas, food producers with cold rooms and engineering firms with heavy machines will find supplies already connected at Vantage Point, without waiting on a grid application. A business that needs only lighting and a kettle gains little and should not pay for a building sized around 2,800 kVA. The listings below show what is available now.
FAQ
How much power does Building 4 at Vantage Point have?
Fisher German's particulars give it a 2,800 kVA supply, with three-phase power and gas. The Sycamore Building has 750 kVA on each floor.
Does Vantage Point Business Village have its own solar power?
Yes. When Sirius bought the park in 2024, panels on some of the buildings supplied most of the site's electricity, and Sirius bought the solar business along with it.
What is the Great British Grid?
A publicly owned body within Great British Energy, announced in September 2026, intended to speed up grid connections for businesses. No timetable has been given.
Is there a solar farm near Mitcheldean?
Yes. 37,000 panels on 50 acres at Locquiers Farm, Plump Hill, were approved in December 2021, enough to power about 4,000 homes.














