For more than 100 years SKF, the Swedish bearing maker, made things in Luton. In October 2023 it confirmed that its factory on Sundon Park Road, where about 300 people made spherical roller bearings, would close, with production ending by the end of 2024. In March 2025 the developer Hillwood bought a 16-acre site on Sundon Park Road, the address of SKF's UK business, with 350,000 sq ft of buildings. By September 2026 the steel frames of eight new units were going up.
A bearing works that shaped a suburb
Sundon Park was first built to serve SKF, with houses going up in the 1920s and 1930s. When SKF sold its original works on Leagrave Road in 1978, it moved to its Sundon Park Road premises. The closure was part of a plan to consolidate the group's spherical roller bearing production, first proposed in May 2023, and production was to move to Poland.
Eight units from 14,251 to 79,975 sq ft
Hillwood Park Luton will have 284,575 sq ft in eight units, due in the first quarter of 2027. The three larger units, of 74,152, 79,975 and 51,817 sq ft, have 12m clear height, dock doors and yards of 40m to 45m. Two have 1 MVA of power and the third 835 kVA. The five smaller units, from 14,251 to 19,105 sq ft, have 10m clear height, level-access doors and 20m yards. All have floors rated for 50 kN per sq m and target an energy rating of A.
A warehouse district north of the town
The council's Local Plan names Sundon Park as a preferred location for storage and distribution. Junction 11a of the M1 is 2.5 miles away, about 6 minutes, and Luton station 4.6 miles. On Dencora Way, agents described nine units of about 4,000 to 14,000 sq ft, each with a yard, in 2021, and 4.45 acres of storage land on the same road was let within two weeks of going on the market.
Power is part of the offer
Hillwood publishes the power supply for each of its three larger units alongside the floor area. On 1 September 2026 Andy Burnham told the Commons that businesses were being quoted ""prohibitively expensive sums"" for grid connections. Great British Grid, announced at the end of that month, has no timetable. A supply of 1 MVA in place on completion can save a business a long wait.
Who Sundon Park suits
Distributors, manufacturers and trade suppliers who need 15,000 to 80,000 sq ft of new space, with tall clear height and a yard, will find a choice of sizes here from early 2027. Businesses needing a few thousand square feet will find older units on Dencora Way and elsewhere in Luton better matched. The listings below show what is available now.
FAQ
What is being built on Sundon Park Road, Luton?
Hillwood Park Luton: eight industrial and warehouse units totalling 284,575 sq ft, from 14,251 to 79,975 sq ft, due in the first quarter of 2027.
When did SKF close its Luton factory?
SKF confirmed the closure in October 2023, with production at its Sundon Park factory ending by the end of 2024. About 300 people worked there.
How far is Sundon Park from the M1?
Hillwood Park Luton is 2.5 miles, about 6 minutes, from junction 11a of the M1, according to its agents.
How much power will the Hillwood Park Luton units have?
The two largest units have 1 MVA each and the 51,817 sq ft unit has 835 kVA. The five smaller units are described as having enhanced power.