Ground was broken beside junction 10 of the M1, on the edge of Luton, in May 2024. By February 2026 the agents for Unit 1 at Junction, 222,135 sq ft, were describing it as ready to occupy. Wrenbridge and Morgan Stanley built it without a tenant, on a 37-acre site with consent for four warehouses totalling 630,513 sq ft. For a large occupier, a finished building removes the wait for planning and construction.
What Unit 1 at Junction has
The building has 18m eaves, 19 dock doors with levellers and 4 level-access doors, a 50m yard and a floor rated for 50 kN per sq m. There are 158 car spaces and 30 lorry spaces. It holds an energy rating of A+ and a BREEAM Excellent certificate. The brochure gives a power supply of 2 MVA, and solar panels on the roof are expected to generate about 322,600 kWh a year. Two plots alongside, of 1.90 and 2.19 acres, are also offered.
Three more warehouses already approved
A second phase, Units 2, 3 and 4, makes up the rest of the 630,513 sq ft. The site is split by Newlands Road. Luton Council's monitoring report records hybrid permission granted in May 2023 for four units totalling 57,891 sq m between junctions 10 and 10a. The Luton Local Plan designates it a Category A employment site, and its developers projected 2,500 jobs across the scheme.
Why junction 10 suits large sheds
The M1 beside the site carries about 136,900 vehicles a day, including 17,228 heavy goods vehicles. Junction 21 of the M25 is 11 miles south, about 13 minutes. Junction 10a was rebuilt in 2015 at a cost of £30 million, with a dual three-lane road from junction 10 to Capability Green and a new roundabout onto Airport Way. The airport is 4 minutes away by car.
Large occupiers also have some choice. Knight Frank put vacancy for warehouses over 50,000 sq ft at 7.3% in the East of England in the second quarter of 2026, and at 8.9% across London and the South East in the third. A finished building with a connection already in place may carry more weight after the Prime Minister, Andy Burnham, told the Commons on 1 September 2026 that businesses were waiting ""far too long"" for grid connections.
Who the Junction warehouses suit
Distributors, retailers and manufacturers needing large buildings close to the M25 and London will find one ready now and others that can be built to order. Small businesses gain little directly from Junction: the four consented units average more than 150,000 sq ft. The listings below include smaller units across Luton.
FAQ
Is there a new warehouse available at M1 junction 10 in Luton?
Yes. Unit 1 at Junction, 222,135 sq ft, was marketed as ready to occupy in February 2026.
How much more warehouse space is planned at Junction, Luton?
Three further units have consent, making four buildings and 630,513 sq ft across the 37-acre site. Unit 1 alone is 222,135 sq ft.
How much power does the Junction warehouse in Luton have?
The February 2026 brochure gives a supply of 2 MVA for the 222,135 sq ft building, with solar panels expected to generate about 322,600 kWh a year.
How far is Junction, Luton, from the M25?
About 11 miles, or 13 minutes, to junction 21 of the M25, according to the agents.